

# HNREL01-BP02 Maintain effective life cycle management for on-premises network equipment
<a name="hnrel01-bp02"></a>

 Implement a structured life cycle management process for all on-premises networking equipment, including routers, switches, and cabling. Track equipment age, support contracts, firmware, and plan for timely refreshes and replacement to avoid end-of-life risks. 

 **Desired outcome:** All network hardware supporting hybrid connectivity remains supported, secure, and reliable throughout its operational life. 

 **Level of risk exposed if this best practice is not established:** High 

 **Benefits of establishing this best practice:** 
+  Reduces risk of unplanned outages due to equipment failure 
+  Ensure continued vendor support and security patching 
+  Simplifies compliance and audit for critical infrastructure 
+  Prevents operational surprises from obsolete hardware 

## Implementation guidance
<a name="implementation-guidance-29"></a>
+  Maintain an asset inventory with warranty or support expiration dates 
+  Monitor firmware and software for patches and end-of-support notices 
+  Budget for regular equipment refresh and upgrade cycles 
+  Retire or replace equipment before it reaches end-of-life 
+  Document and regularly review network equipment management procedures 