GAMEOPS03-BP04 Adopt a deployment strategy that minimizes impact to players - Games Industry Lens

GAMEOPS03-BP04 Adopt a deployment strategy that minimizes impact to players

Incorporate a deployment strategy for your game software and infrastructure that minimizes the amount of downtime that keeps players out of your game. While certain types of updates might require installing new updates to the game client, design the game to minimize or avoid the need for downtime during deployments.

Level of risk exposed if this best practice is not established: High

Implementation guidance

One of the most important steps to consider when developing a game deployment strategy is to determine how your game infrastructure will be managed. Manage your game infrastructure using an infrastructure as code (IaC) tool such as AWS CloudFormation or Terraform by Hashicorp to reduce human errors during environment preparation. Infrastructure templates can be deployed and tested in automated pipelines, which creates consistency in the configuration of different game environments.

There are several deployment strategies that can be used for a game:

Rolling substitution

The primary objective of a rolling substitution for deployment is to perform the release without shutting down the game and without impacting players. It is important that the upgrade or changes that are to be performed are backward compatible and will work adjacent to the previous versions of the system.

In this deployment, the server instances are incrementally replaced (substituted or rolled out) by instances running the updated version. This rolling substitution can be performed in a few different ways. For example, to implement rolling updates to a fleet of dedicated game servers, a typical approach involves creating a new Auto Scaling group of EC2 instances that contain the new game server build version deployed onto them, and then gradually routing players into game sessions hosted on this new fleet of servers. If there is an associated game client update that is required as a prerequisite to use the new game server build, then you must include a validation check to verify that only players that have this new game client update installed are routed into these game sessions.

Server fleets (for example, EC2 Auto Scaling groups) containing the old game server build version are only removed from service after they are drained of active player sessions in a graceful manner, typically by setting up individualized-server metrics that allow game operations teams to automate this process. Alternatively, to reduce the amount of infrastructure and time to conduct a rolling deployment, an alternative approach can be performed where existing production instances are removed from service, updated with the new game server build, and then placed back into the production fleet. This approach reduces the amount of infrastructure that is required, but it also increases risk since the number of available live game servers for players is reduced as servers are being replaced.

This model can also be used for performing rolling deployments to backend services such as databases, caches, and application servers that don't host gameplay. As long as these services are deployed in a highly-available manner with multiple clustered instances, then the complexity of deployments to these services should be less than deployments to dedicated game servers.

Blue/green deployment

The primary objective of a blue/green deployment in a game is to minimize downtime while also allowing safe rollback to the previous deployment if issues are identified. It is suitable for deployments where two versions of the game backend are compatible and can serve players simultaneously.

In the blue/green deployment strategy, two identical environments (blue and green) are set up. The existing game version is labeled as blue, while the new game version that is the deployment target is labeled as green. When the green environment is ready for migration, you can configure your routing layer to flip the traffic over to the green environment while keeping the old environment (blue) available in case failback is needed. In this scenario, the routing updates might require updating the matchmaking service to configure it to begin sending game sessions to the new fleet, or in the case of game backend services, this could be updating DNS records in Amazon Route 53 for your service or shifting application load balancer weights to send traffic to your new target group.

One of the drawbacks of the blue/green deployment strategy is the inherent cost of the standby environment due to the additional infrastructure required while performing the deployment. An option to mitigate this additional infrastructure cost is to consider adopting a variant of blue/green deployment where new game software is deployed onto the same servers that are already deployed into production. In this scenario, a new green server process can be started with the new software alongside the existing blue server process, with the cutover happening between server processes rather than between separate physical infrastructure. This approach can also speed up game deployments across a large amount of infrastructure by removing the need to wait for new servers to be launched in the cloud. For best practices on this deployment approach, see Blue/Green Deployments on AWS.

Canary deployment

Canary deployment is useful for game developers, as the strategy can be applied to release an early alpha or beta build of a game, or a game feature like a new game mode, map, or challenge to a restricted or small set of players in-production. Such a deployment is called a canary. The release may have additional tracking and reporting, so when real players play that game or feature, their game play telemetry is collected and analyzed for anomalies and issues.

For new features, the players are not consistently notified about this, and the game telemetry is the primary source used to determine if players are experiencing issues and the release should be rolled-back. At the same time, if no significant issues are identified, the feature can then be further rolled out to more players for additional data. If the players are notified, then they can be asked to provide regular feedback about their experience. Such test activity would ideally be coordinated by a live operations team.

As a strategy, canary deployment can also be used for standard releases to gradually make a new feature available to the players. A potential advantage over the standard blue/green environment is that a full-scale second environment is not required. The capacity of the new scaled-down environment determines how many players are to be onboarded to the new feature. Before adding more players, the capacity must be scaled appropriately. Even if this customized blue/green technique is expected to cost comparatively lesser than standard blue/green, it is still estimated to incur cost that may be higher than the rolling substitution technique of canary deployments.

Run only a single canary on a production environment, and focus it for its data and feedback. If multiple canaries are deployed, it complicates troubleshooting and isolating of issues in production and impairs the quality of the datasets and feedback being collected.

A variation in the canary is when one or more experiments (generally UI tests) are run through targeted deployments, where one set of the game backend servers serve one version of a feature and another same-sized set serve another version of the same feature. No additional or special infrastructure is created for this, and only the chosen pockets of backend servers receive these updates. The outcome of the experiments is to observe how players react to each of the versions of the same feature, determine if there is a consensus of overall like or dislike, and observe if there are issues identified with its usability or functionality. Such strategic experiments are also called A/B tests, and the overall process is called A/B testing. On completion of these experiments, necessary test data is collected before reverting to the current version of the game backend system on the servers used for the tests.

Legacy traditional deployments

In the traditional style of deployment, during a scheduled maintenance window the game is shut down and connected players are dropped or drained before server instances within the game backend are updated with the latest code builds. This deployment impacts players each time it is performed, and the players must be notified ahead of the schedule. As a result, this model causes the most player impact and should be avoided whenever possible.

After the game update is deployed, the game can be smoke tested prior to opening the game to the players, who would be waiting for the game to reopen. This can cause a spike of traffic when players try to login and play within a short period of time. Therefore, if the game is not designed to handle such spikes of traffic, you can choose to gradually allow players back into the game in batches.

Alternatively, you can opt to over-provision the infrastructure to sustain the opening spike of traffic, and after the game traffic settles, resources can be scaled down. If necessary, conduct this type of deployment during off-peak hours when the number of players is at its lowest. Frequently scheduled maintenance, as well as extended maintenance, inherently carries a risk of player attrition and potential loss of revenue. Players also expect changes after a new release and can lose trust in the game once returning after a period of downtime.

Implementation steps

  • Minimize downtime: Implement deployment strategies that reduce downtime and keep players in the game.

  • Infrastructure as code (IaC): Use tools like AWS CloudFormation or Terraform to manage game infrastructure and reduce human errors.

  • Deployment strategies: Use one or a combination of rolling substitution, blue/green, and canary deployments to provide smooth updates and reduce player impact.