# Step J: Fail back the running channels
<a name="upg-red-back"></a>

Move the running channels back to the upgraded active node by failing over the backup node that they're currently on.

**To fail-back channels**

1. On the web interface for the primary Conductor Live node, access **Cluster** > **Redundancy**.

1. Select the worker node redundancy group.

1. On the **Active Nodes** tab, locate the node that the channels failed over to and choose the **Initiate Fail over** button (double arrows).

   The upgraded node is moved to the **Active Nodes** tab and the running channels are moved from the backup worker.

1. When all channels are moved back to the active worker node, re-designate the backup worker node as a backup, as described in the next step.