Step J: Fail back the running channels
Move the running channels back to the upgraded active node by failing over the backup node that they're currently on.
To fail-back channels
On the web interface for the primary Conductor Live node, access Cluster > Redundancy.
Select the worker node redundancy group.
On the Active Nodes tab, locate the node that the channels failed over to and choose the Initiate Fail over button (double arrows).
The upgraded node is moved to the Active Nodes tab and the running channels are moved from the backup worker.
When all channels are moved back to the active worker node, re-designate the backup worker node as a backup, as described in the next step.